2013-14 DPR Supplementary Information Tables

  1. Departmental Sustainable Development Strategy
  2. Details on Transfer Payment Programs
  3. Internal Audits and Evaluations
  4. Response to Parliamentary Committees and External Audits
  5. Sources of Respendable and Non-Respendable Revenue
  6. Up-Front Multi-Year Funding; and
  7. User Fees Reporting.

Departmental Sustainable Development Strategy

1. Overview of the Federal Government's Approach to Sustainable Development

The Federal Sustainable Development Strategy (FSDS) 2013–16, tabled on November 4, 2013, guides the Government of Canada's sustainable development activities, as required by the Federal Sustainable Development Act (FSDA). In keeping with the objectives of the FSDA, to make environmental decision making more transparent and accountable to Parliament, Western Economic Diversification Canada (WD) supports the implementation of the FSDS through the activities found in this departmental strategy.

Accordingly, this Departmental Sustainable Development Strategy (DSDS) presents the results for commitments for Theme I – Addressing Climate Change and Air Quality and Theme II – Maintaining Water Quality and Availability within the context of the 2013–16 FSDS. This DSDS also provides the results for Theme IV – Shrinking the Environmental Footprint – Beginning with Government based on the 2010–13 FSDS.

2. Themes I–III: Department/Agency–led Targets

Not Applicable.

FSDS Goal FSDS Performance Indicator FSDS Target FSDS Performance Status
       

3. Themes I–III: Implementation Strategies

Through the FSDS, WD has committed to diversify the western Canadian economy by making strategic investments in the commercialization and adoption of clean energy and clean water technologies through the Western Diversification Program.  WD's investments in clean energy and clean water technologies contribute to the FSDS goals and implementation strategies of mitigating climate change (1.1.39), reducing air pollutants (2.1.4) and increasing water availability (3.12.2).

WD has three key program areas that frame program investments: business development and innovation, community economic growth, and policy, advocacy and coordination.  The technology commercialization sub-program and innovation capacity building sub-program are components of WD's business development and innovation program area.  WD's FSDS implementation strategies related to clean energy and clean water technologies are met through the department's Business Development and Innovation Program.  Specifically, WD's investments in clean energy and clean water technologies are made through the technology commercialization and innovation capacity building sub-programs, through which WD supports projects designed to increase the number of western Canadian technologies brought to market.

WD's strategic investments in clean energy and clean water technologies are measured using the performance indicators associated with the sub-programs of technology commercialization and innovation capacity building.  For instance, projects that concluded in 2013–14 resulted in technology adoption and demonstration for innovative clean energy technologies, and in prototype development and technology demonstration for clean water technologies.

4. Theme IV: Implementation Strategies

Surplus Electronic and Electrical Equipment Target

By March 31, 2014, each department will reuse or recycle all surplus electronic and electrical equipment (EEE) in an environmentally sound and secure manner. (Target 8.6 from 2010–13 FSDS)

Performance Measure Performance Status
Target status Achieved
Existence of an implementation plan for the disposal of all departmentally generated EEE Yes, see (ii) below.
Total number of departmental locations with an EEE implementation plan fully implemented, expressed as a percentage of all locations, by the end of the given fiscal year Six locations – 100% application of EEE implementation plan in all locations.

Strategies and/or Comments

  1. Western Economic Diversification Canada (WD) has defined "location" as the six cities noted below in which the department has offices.
    • Vancouver, British Columbia
    • Edmonton, Alberta
    • Calgary, Alberta
    • Saskatoon, Saskatchewan
    • Winnipeg, Manitoba
    • Ottawa, Ontario
       
  2. WD achieved full implementation of acceptable EEE disposal practices in June 2009 using the following means:
    • Computers for Schools,
    • Crown Assets distribution,
    • Return to Vendor programs,
    • Provincial recyclers and
    • Public Works and Government Services Canada Electronic Waste Disposal Standing Offer.
       
  3. Electronic data storage devices are cleared and declassified according to the Communications Security Establishment Canada Directive ITSG-06, dated July 2006.
     
  4. WD follows Information Technology (IT) Media Overwrite Guidelines as set out in the RCMP Technical Services Branch IT Security Bulleting Lead Agency Publication B2-002, dated May 2009.
     

Printing Unit Reduction Target

8.7 By March 31, 2013, each department will achieve an 8:1 average ratio of office employees to printing units. Departments will apply the target where building occupancy levels, security considerations and space configuration allow. (Target 8.7 from 2010–13 FSDS)

Performance Measure Performance Status
Target status Opportunity for improvement
Ratio of departmental office employees to printing units in fiscal year 2010-11, where building occupancy levels, security considerations and space configuration allow (Optional) 3.9:1
Ratio of departmental office employees to printing units at the end of the given fiscal year, where building occupancy levels, security considerations and space configuration allow 6.5:1

Strategies and/or Comments

  1. Definition of Printing Unit: Networked (including local/desktop printers), stand-alone (non-networked), single purpose and multi-functional units (e.g., photocopiers) are included.
  2. Target Scope: To reduce departmental reporting and simplify tracking of this target, the department did not include fax machines, scanners, communications security equipment and offices with less than eight people, which represent less than 1.8% of office employees, and the Deputy Ministers' and Ministers' offices.
  3. Method Used for Determining the Number of Printing Units: Inventory confirmed by regional administration officials and/or Information Management staff.
  4. Method Used for Determining the Number of Employees: Number of employees effective March 31, 2014 as provided by Human Resources, plus 2 Department of Foreign Affairs, Trade and Development Trade Commissioners and 11 Shared Services Canada staff co-located in Western Economic Diversification Canada (WD) offices.
  5. Implementation Strategies:
    • Stand-alone and single-purpose printers are not replaced at end-of-life; and
    • Multi-function printers are replacing single-purpose units.
  6. Rationale for traffic light indicator selected: WD was unable to fully realize its target of 8:1 for 2013-14.
  7. Plans for Engagement: Further reductions of stand-alone printers to be realized in 2014-15, except where required for mobility impaired individual.

Paper Consumption Target

8.8 By March 31, 2014, each department will reduce internal paper consumption per office employee by 20%. Each department will establish a baseline between 2005-06 and 2011-12, and an applicable scope. (Target 8.8 from 2010–13 FSDS)

Performance Measure Performance Status
Target status Exceeded
Number of sheets of internal office paper purchased or consumed per office employee in the selected baseline year, according to the departmental scope 3,564
Cumulative reduction (or increase) in paper consumption per office employee in the given fiscal year, expressed as a percentage, relative to the selected baseline year 59.7%

Strategies and/or Comments

  1. Scope: Western Economic Diversification Canada (WD) has elected to include all departmental employees, including 2 Department of Foreign Affairs, Trade and Development (DFATD) Trade Commissioners and 11 Shared Services Canada employees co-located in our offices who utilize departmental printers/supplies.
  2. Method Used for Determining Paper Consumption: Public Works Government Services Canada (PWGSC) Report on Standing Offer Paper Purchases.
  3. Method Used for determining the Number of Employees: Number of all departmental employees as of March 31, 2014, as well DFATD and Shared Services Canada employees co-located in our offices.
  4. Number of Office Employees Subject to the Target: 352 office employees.
  5. Rationale for Traffic Light Indicators: WD exceeded the 20% reduction in paper consumption by March 31, 2014.  Baseline consumption for 2013-14 was 7,080 sheets of paper per office employee.
  6. Reporting Requirements: Manager, Corporate Administration, collects PWGSC standing offer information annually.
  7. Roles and Responsibilities: Manager, Corporate Administration, is target lead.  Procurement Officers and acquisition card holder are required to only purchase paper from a PWGSC standing offer.

Green Meetings Target

8.9  By March 31, 2012, each department will adopt a guide for greening meetings. (Target 8.9 from 2010–13 FSDS)

Performance Measure Performance Status Target status Achieved Presence of a green meetings guide Yes: Adopted November 2011

Strategies and/or Comments

  1. A Simplified Guide to Greener Meetings was developed by the Federal Sustainable Development Strategy Committee in November 2011.
     
  2. The guide and checklist were introduced at a launch event during the Greening Government Awareness event held in March 2012 and are available on WD's internal web site.
     

Green Procurement Targets

8.10 As of April 1, 2011, each department will establish at least three SMART green procurement targets to reduce environmental impacts. (Target 8.10 from 2010–13 FSDS)

8.10(i) Effective April 1, 2012, 100% of copy paper purchased will contain a minimum of 30% recycled content and a forest management, EcoLogoM or equivalent certification.

Performance Measure Performance Status
Target status Achieved
Percentage of copy paper purchased that contains a minimum of 30% recycled content and a forest management EcoLogoM or equivalent certification (FY 2009-10 baseline) 88%
Progress against measure in FY 2010-11 80.2%
Progress against measure in the given fiscal year 100%

Strategies and/or Comments

  1. Method Used to Determine Paper Purchase: PWGSC Quarterly Report on Standing Offer Paper Purchases – Quarterly Totals by Recycled Content
     
  2. Rationale for Traffic Light Indicator Selected: PWGSC reported that paper contained a minimum of 30% recycled content or higher for all purchases.
     

8.10(ii) As of April 1, 2011, WD purchased 100% of its IT hardware from PWGSC Consolidated Procurement Instruments.

Performance Measure Performance Status
Target status Achieved
Percentage of IT hardware purchased from PWGSC Consolidated Procurement Instruments) (FY 2009-10 baseline) 100%
Progress against measure in the given fiscal year 100%

Strategies and/or Comments

  1. WD will continue to purchase its IT hardware from Consolidated Procurement Instruments, which are "greened" through PWGSC's Commodity Management Framework.

8.10(iii)  By March 31, 2013, WD will procure recycling services to ensure that all paper and paper products are disposed of in an environmentally responsible manner.  Full department implementation of recycling services will be completed by March 31, 2014.

Performance Measure Performance Status
In FY 2011-12, each location will outline current process and amount (weight) of waste paper and paper products 0%
Progress against measure in the given fiscal year 83.3%

Strategies and/or Comments

  1. WD has six office locations, with varying disposal methods for paper and paper products (see target 8.6 for definition of "location").

8.11 As of April 1, 2011, each department will establish SMART targets for training, employee performance evaluations and management processes and controls, as they pertain to procurement decision making. (Target 8.11 from 2010–13 FSDS)

8.11(i) As of April 1, 2011, Green Procurement Training became mandatory for the following employees:

  1. Procurement Functional Specialists
  2. Materiel Management Functions Specialists
  3. Acquisition Card holders
  4. Manager, Corporate Administration – Headquarters
  5. Regional Managers, Finance & Corporate Services
     
Performance Measure Performance Status
Percentage of designated employees who completed green procurement training (FY 2009-10 baseline) 30%
Progress against measure in the given fiscal year (ongoing) 100%

Strategies and/or Comments

  1. Rationale for traffic light indicator selected:  The procurement function in WD was centralized in 2013-14 fiscal year, and all procurement/material management staff and acquisition card holders have appropriate green procurement training.
     
  2. Ongoing training will be offered for new employees identified in target 8.11(i), as required.
     

8.11(ii)  As of April 1, 2012, all designated employees will have green performance evaluation measures identified.

Performance Measure Performance Status
Target status Achieved
Percentage of designated employees with green performance evaluation measures identified (FY 2009-10 baseline) 12.5%
Progress against measure in the given fiscal year (ongoing) 100%

Strategies and/or Comments

  1. Rationale for traffic light indicator selected: The procurement function in WD was centralized in 2013-14 fiscal year and all designated employees, specifically procurement/material management staff, have appropriate green performance measures identified.

8.11(iii)  As of April 1, 2011, the following management processes and controls were fully implemented:

  1. WD Procurement Strategy,
  2. Electronic Bid Box,
  3. Lifecycle Management in Asset Management Framework,
  4. Bi-annual green government awareness events and ongoing communication, and
  5. GX Financial system green tracking.
     
Performance Measure Performance Status
Target status Achieved
Percentage of management processes and controls implemented (FY 2009-10 baseline) 80%
Progress against measure in the given fiscal year (ongoing) 100%

Strategies and/or Comments

  1. Green procurement commitments were stated in WD's Procurement Strategy.  The use of PWGSC Green CPIs is mandatory.
     
  2. The use of the Electronic Bid Box is fully integrated in WD, resulting in decreased paper consumption and increased electronic filing.
     
  3. Ongoing Lifecycle Management will reduce the number of prints and paper consumption.
     
  4. The Sustainable Development Strategy Committee is responsible for green awareness events, tips and hints to help reduce WD's footprint, and the Manager, Corporate Administration, provides ongoing advice to the Procurement Unit.
     
  5. Project tracking in the department's financial systems has been improved, with full identification of green purchases.
     

Reporting on the Purchase of Offset Credits

Not Applicable

Performance Measure Performance Status
Quantity of emissions offset in the given fiscal year  

5. Additional Departmental/Agency Sustainable Development Activities and Initiatives

Not Applicable.

6. Sustainable Development Management System

In keeping with WD's mandate to develop and diversify the western Canadian economy, WD's programming efforts with respect to sustainable development focus on projects that create economic benefits for Western Canada.  For instance, WD continues to make investments in clean energy and water technologies in order to increase the number of western Canadian technologies brought to market.  WD's sustainable development vision is that the western Canadian economy is growing, diversified and sustainable.

In order to achieve its sustainable development objectives, WD fosters practices that promote sustainable development in its internal operations and project investment activities.  WD initiatives related to sustainable development are incorporated into the department's planning, tracking and reporting systems.  WD's project assessment tool allows for projects to be identified and aligned with an FSDS goal if applicable.  A project's FSDS alignment is considered during the funding decision process.  Sustainable development projects are reported in Client Driven Impact Surveys and on WD's public website.

WD senior management's responsibilities for integrating sustainable development principles into the department's policies, programs and operations are supported by a departmental sustainable development team.  The team includes a headquarters Chair and Leads in each regional office.  The team shares information and liaises with project and policy officers to inform sustainable development decision making.

Strategic Environmental Assessment

During the 2013–14 reporting cycle, WD considered the environmental effects of initiatives subject to the Cabinet Directive on the Environmental Assessment of Policy, Plan and Program Proposals, as part of its decision–making processes.  In 2013-14, WD did not develop any initiatives that required a strategic environmental assessment; as such, no related public statements were produced.

 

Details on Transfer Payment Programs

Details on Transfer Payment Programs including:


 

Name of Transfer Payment Program: Western Diversification Program (WDP)

Start Date: 1987-1988

End Date: On-going

Description: This program was designed to promote economic development and diversification in Western Canada and advance the interests of Western Canada in national policy, program and project development and implementation.

Strategic Outcome: A growing and diversified western Canadian economy.

Results Achieved:

  • A strengthened western innovation system.
  • An expanded business sector in Western Canada.
  • Increased investment in strategic federal/regional economic development priorities that improves the viability, prosperity and quality of life in communities across Western Canada.
  • A better understanding of Western Canada's needs, opportunities and aspirations inside and outside of the region leading to improved programs and services for western Canadians.
Program: Policy, Advocacy and Coordination
($ thousands)
  2011-12
Actual
Spending
2012-13
Actual
Spending
2013-14
Planned
Spending
2013-14
Total
Authorities
2013-14
Actual
Spending
Variance(s)
Total Contributions $35 $881 $2,500 $2,500 $1,762 $738
Total Policy, Advocacy and Coordination $35 $881 $2,500 $2,500 $1,762 $738
 
Program: Community Economic Growth
($ thousands)
  2011-12
Actual
Spending
2012-13
Actual
Spending
2013-14
Planned
Spending
2013-14
Total
Authorities
2013-14
Actual
Spending
Variance(s)
Total Grants $500 - $1,475 - - $1,475
Total Contributions $6,042 $1,935 $1,364 $1,843 $1,298 $66
Total Community Economic Development $6,542 $1,935 $2,839 $1,843 $1,298 $1,541
 
Program: Business Development and Innovation
($ thousands)
  2011-12
Actual
Spending
2012-13
Actual
Spending
2013-14
Planned
Spending
2013-14
Total
Authorities
2013-14
Actual
Spending
Variance(s)
Total Grants - - $3,525 - - $3,525
Total Contributions $87,538 $78,369 $70,593 $79,879 $78,778 $(8,185)
Total Business Development and Innovation $87,538 $78,369 $74,118 $79,879 $78,778 $(4,660)
 
($ thousands)
  2011-12
Actual
Spending
2012-13
Actual
Spending
2013-14
Planned
Spending
2013-14
Total
Authorities
2013-14
Actual
Spending
Variance(s)
Total Western Diversification Program Grants & Contributions $94,114 $81,185 $79,457 $84,222 $81,838 $(2,381)

Comment(s) on variance(s): Funding received through the Supplementary Estimates for the Rick Hansen Foundation attributed to higher spending under the Business Development and Innovation Program than planned spending amounts for 2013-14.  Since Policy, Advocacy and Coordination objectives are achieved primarily through operational activities; any G&C spending in this area will result in year-over-year fluctuations.

Audit Completed or Planned: WD's internal audit function has been transferred to the Office of the Comptroller General (OCG). All audits of the Regional Development Agencies (RDAs), including WD, will be conducted by OCG in accordance with their RDA Risk-Based Audit Plan (RBAP).  Previous WDP audit was completed September 2009.

Evaluation Completed or Planned: A Trade and Investment activity evaluation, which is within the Business Development Program area, was conducted during 2012–13 and the final report was posted on-line March 2014.  An evaluation of the Business Productivity and Growth area, which is within the Business Development and Innovation Program area, is planned to be conducted during 2014–15.

 

Engagement of applicants and recipients: None

 

 

 

Name of Transfer Payment Program: Community Futures Program (CF)

Start Date: May 18, 1995

End Date: On-going

Description: This program was designed to provide funding for a network of Community Futures Development Corporations (CFDC) across Canada with WD as the delivery department for the west. CFDCs are volunteer-led, non-profit organizations that lead strategic economic planning, and provide advice and commercial loans to local entrepreneurs, which foster economic development.

Strategic Outcome: A growing and diversified western Canadian economy.

Results Achieved:

  • Strategic community planning: Working with communities to assess local problems, establish objectives, plan and implement strategies to develop human, institutional and physical infrastructures, entrepreneurship, employment, and the economy.
  • Business Services: Delivering a range of business, counseling and information services to small and medium sized enterprises.
  • Access to capital: Provide capital to assist businesses or to help entrepreneurs to create new businesses.
Program: Community Economic Growth (CF)
($ thousands)
  2011-12
Actual
Spending
2012-13
Actual
Spending
2013-14
Planned
Spending
2013-14
Total
Authorities
2013-14
Actual
Spending
Variance(s)
 Total Grants  -  -  -  -  -  -
Total Contributions $13,779 $10,012 $28,454 $29,525 $29,525 $(1,071)
Total Community Economic Growth $13,779 $10,012 $28,454 $29,525 $29,525 $(1,071)
 
Program: Business Development and Innovation (CF)
($ thousands)
  2011-12
Actual
Spending
2012-13
Actual
Spending
2013-14
Planned
Spending
2013-14
Total
Authorities
2013-14
Actual
Spending
Variance(s)
 Total Grants  -  -  -  -  -  -
Total Contributions $13,779 $19,436 - - - -
Total Business Development and Innovation $13,779 $19,436 - - - -
 
($ thousands)
  2011-12
Actual
Spending
2012-13
Actual
Spending
2013-14
Planned
Spending
2013-14
Total
Authorities
2013-14
Actual
Spending
Variance(s)
Total Community Futures Program - Contributions $27,578 $29,448 $28,454 $29,525 $29,525 $(1,071)
 

Comment(s) on Variance(s): n/a

Audit completed or planned:  WD's internal audit function has been transferred to the Office of the Comptroller General (OCG). All audits of the Regional Development Agencies (RDAs), including WD, will be conducted by OCG in accordance with their RDA Risk-Based Audit Plan (RBAP).

Evaluation completed or planned: An evaluation of the Community Futures Program was conducted during 2013–14 and the final report will be posted on-line in fall 2014.

Engagement of applicants and recipients: None

 

 

 

 

Name of Transfer Payment Program: Community Infrastructure Improvement Fund (CIIF)

Start Date: April 1, 2012

End Date: March 31, 2014

Description: This program is meant to support the rehabilitation and improvement, including expansion, of existing community infrastructure facilities such as community centres, recreational buildings, local arenas, cultural facilities and other community facilities. The CIIF will improve the quality of community facilities and provide economic benefits, including support for job creation, in communities across Canada.

Strategic outcome: A growing and diversified western Canadian economy.

Results achieved: As of March 31, 2014, WD had 730 projects which expended program funds to rehabilitate and improve existing community infrastructure in Western Canada.

Program: Community Economic Growth (CIIF)
($ thousands)
  2011-12
Actual
Spending
2012-13
Actual
Spending
2013-14
Planned
Spending
2013-14
Total
Authorities
2013-14
Actual
Spending
Variance(s)
Total Grants  -  -  -  -  -  -
Total Contributions - $18,786 $23,100 $27,399 $25,656 $(2,556)
Total Program Activity - $18,786 $23,100 $27,399 $25,656 $(2,556)
 
Program: Community Economic Growth (CIIF)
($ thousands)
  2011-12
Actual
Spending
2012-13
Actual
Spending
2013-14
Planned
Spending
2013-14
Total
Authorities
2013-14
Actual
Spending
Variance(s)
Total Community Infrastructure Improvement Fund - Contributions - $18,786 $23,100 $27,399 $25,656 $(2,556)

 

 

 

Comment(s) on variance(s): This program was announced in Budget 2012 as part of Canada's Economic Action Plan. WD transferred $4.3 M of unspent funds from 2012-13 through the 2013-14 Supplementary Estimates to meet contractual obligations in 2013-14.  The transfer of funds resulted in higher actual spending in 2013-14 with regard to planned spending amounts, with a marginal lapse of $1.7 million (or 3.8%) in the two-year CIIF program overall.

Audit completed or planned: WD's internal audit function has been transferred to the Office of the Comptroller General (OCG). All audits of the Regional Development Agencies (RDAs), including WD, will be conducted by OCG in accordance with their RDA Risk-Based Audit Plan (RBAP).

 

Evaluation completed or planned: No evaluation is planned at this time.

 

Engagement of applicants and recipients: None

 

Name of Transfer Payment Program: Women's Enterprise Initiative (WEI)

Start Date: October 1995

End Date: On-going

Description: This program provides loans, business advisory services and business training targeted to women entrepreneurs.

Strategic outcome: A growing and diversified western Canadian economy.

Results achieved:

  • Support the development and growth of female-led businesses;
  • Increased availability of capital to women-owned enterprises; and
  • Provided services to help women develop the experience, expertise, assets and credit track records enabling them to increase both the number and strength of women-owned businesses in Western Canada.
 
Program: Business Development and Innovation (WEI)
($ thousands)
  2011-12
Actual
Spending
2012-13
Actual
Spending
2013-14
Planned
Spending
2013-14
Total
Authorities
2013-14
Actual
Spending
Variance(s)
Total Grants  -  -  -  -  -  -
Total Contributions $4,701 $4,041 $3,900 $5,987 $5,987 $(2,087)
Total Program Activity $4,701 $4,041 $3,900 $5,987 $5,987 $(2,087)
 

($ thousands)
  2011-12
Actual
Spending
2012-13
Actual
Spending
2013-14
Planned
Spending
2013-14
Total
Authorities
2013-14
Actual
Spending
Variance(s)
Total Women's Enterprise Initiative - Contributions $4,701 $4,041 $3,900 $5,987 $5,987 $(2,087)
 

Comment(s) on variance(s): WD initially invested $3.9 million in Women's Enterprise Initiative (WEI) funding in 2013-14 to provide business information and services to women entrepreneurs. Actual spending under this program increased by $2.1 million to respond to the increased demand for loan activities across the western provinces.

Audit completed or planned: WD's internal audit function has been transferred to the Office of the Comptroller General (OCG). All audits of the Regional Development Agencies (RDAs), including WD, will be conducted by OCG in accordance with their RDA Risk-Based Audit Plan (RBAP). Previous WEI audit was completed in 2008.

Evaluation completed or planned: An evaluation of the Women's Enterprise Initiative was conducted during 2012–14 and the final report was posted on-line in January 2014.

Engagement of applicants and recipients: None

 

Internal Audits and Evaluations

A Service Level Agreement has been established between the Internal Audit Sector of the Office of the Comptroller General of Canada (OCG) and the federal regional development agencies (RDAs), including WD. This agreement became effective April 1, 2012, and details the provision of internal audit services by the OCG to the RDAs.

As a result of this agreement, in 2013 a RDA Risk-Based Audit Plan (RBAP) was developed for audits to be conducted in the 2013–14 fiscal year.

 

Internal Audits (2013-14)
Name of internal audit Internal Audit Type Status Completion date
RDAs Audit of the Management Control Framework over the Recipient Selection Process for Selected Grants and Contributions Programs RDA Completed July 2013
Horizontal Audit of the  Protection of Personal Information in Small Departments Horizontal Audit Completed April 2014

 

 

 

Evaluations (2013-14)
Name of evaluation Program Status Completion Date
Evaluation of Trade and Investment Activity Business Development Completed December 2013
Evaluation of Women's Enterprise Initiative Business Development Completed January 2014
Evaluation of the Community Futures Program Community Futures Pending approval of report June 2014

 

 

 

As completed audit and evaluations reports become available, they will be accessible through WD’s website.

 

Response to Parliamentary Committees and External Audits

Response to Parliamentary Committees

Standing Committee on Public Account (PACP) 41-1 – Meeting No. 84
3:30 p.m. to 5:35 p.m., April 16, 2013

Discussion: Pursuant to Standing Order 108(3)(g) and the motion adopted by the Committee on Tuesday, February 5, 2013, the Committee commenced consideration of Chapter 2, Grant and Contribution Program Reforms, of the Fall 2012 Report of the Auditor General of Canada referred to the Committee on Tuesday, October 23, 2012.

Follow up:  None

 

Sources of Respendable and Non-Respendable Revenue

Respendable Revenue - nil

Non-Respendable Revenue

 

All Programs Actual
2011-12
($ thousands)
Actual
2012-13
($ thousands)
2013-14
($ thousands)
Planned
Revenue
Actual
 
Repayments of Contributions 7,564 3,011 2,200 4,184
Adjustment to previous years payables at year end 1,281 1,103 500 1,438
 
Other Revenue 2,033 4,474 - 4,518
Total Respendable Revenue 10,878 8,588 2,700 10,140

 

 

* Note: Non-respendable revenue is not reported by PAA as amounts are minimal.

 

Up-Front Multi-Year Funding

Name of recipient: Primrose Lake Economic Development Corporation (PLEDC)

Start date: March 30, 2007

End date: March 31, 2027

Total funding: $15,000,000

Description: Create a community controlled trust fund for economic development.

Strategic outcome(s): The Western economy is developed and diversified.

Summary of results achieved by the recipient: During fiscal 2013–14, the Board continued to work on their Strategic Plan. PLEDC formed strategic partnerships with other groups and investigated regional projects in tourism, fishing, forestry and oil and gas, which may impact the 2014–15 fiscal year.

PLEDC continues to distribute funds based on new applications from the communities.  From April 1, 2013 to March 31, 2014, PLEDC approved or committed grants and loans of $559,491 and disbursed funding of $288,426 to clients for economic development initiatives.   Financial Statements are pending for 2013–14.

Program: (amounts do not include Operating costs)
($ millions)
Actual
Spending

2011-12
Actual
Spending
2012-13
Planned
Spending
2013-14
Total
Authorities
2013-14
Actual
Spending
2013-14
Variance(s)
$0 $0 $0 $0 $0 $0

Comments on variance(s): n/a

Significant Evaluation findings by the recipient during the reporting year and future plan: The next evaluation is required in fiscal 2017.

Significant Audit findings by the recipient during the reporting year and future plan:
No audits performed to date. Date for an audit in the future has not yet been identified.

URL to Recipient's Site: www.pledco.ca

User Fees Reporting

User Fees and Regulatory Charges (User Fees Act)

 

User Fee: Fees charged for the processing of access requests filed under the Access to Information Act (ATIA)

Fee Type: Other products and services (O)

Fee-setting Authority: Access to Information Act

Date Last Modified: 1992

Performance Standards: Response provided within 30 days following receipt of request; the response time may be extended pursuant to section 9 of the ATIA.

Performance Results: The Department responded within 30 days or less in 64 per cent of completed requests.  *An additional 22 per cent of the remaining requests were completed within 31 to 60 days, and 14 per cent completed within 60 to 120 days.

* A Notice of Extension is sent to the requestor within 30 days of receipt of the request.

 

2013-14
($ dollars)
Planning Years
($ dollars)
Forecast Revenue Actual Revenue Full Cost Fiscal Year Forecast Revenue Estimated Full Cost
$250.00 $135.00 $310.00 2014-15 $250.00 $500.00
2015-16 $250.00 $500.00
2016-17 $250.00 $500.00

Other information:  Under the Access to Information Act, fees under $25 may be waived when deemed to be in the public interest.  Fees waived during 2013–14 represented $175.00, including $30 in application fees.

 